Project Description

Project title A HIGH EFFICIENCY AND LOW LOSS POWER TRANSMISSION AND DISTRIBUTION SYSTEM IN MONGOLIA
Ref No. MN005
PDD form 
Monitoring plan
 
Supporting documentation
 
Supporting documentation
MoC(PDF) MoC
Name of project participants (Mongolia) NATIONAL POWER TRANSMISSION GRID State Owned Stock Company (NPTG)
Name of project participants (Japan) Hitachi, Ltd.
Name of third party entity (TPE) TPE-MN-007 Lloyd’s Register Quality Assurance Limited
Location of project Country: Mongolia
Region/State/Province etc: Ömnögovi and Dornogovi provinces
City/Town/Community etc: (1) Ömnögovi province; (a) Khanbogd county (length of transmission line in county: 74 km); (b) Manlai county (length of transmission line in county: 48 km); (2) Dornogovi province; Mandakh county (length of transmission line in county: 37.4 km).
Latitude, longitude:(1)Ömnögovi province: N43°06’26.4”,E106°46’10.0”; (2)Dornogovi province: N43°52’46.5″,E108°20’27.5″.
Duration Starting date of project operation: 01 Oct 17
Expected operational lifetime of project: 14 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year

  • – (in 2013)
  • – (in 2014)
  • – (in 2015)
  • – (in 2016)
  • 12 (in 2017)
  • 25 (in 2018)
  • 93 (in 2019)
  • 441 (in 2020)
Status Project registered
Public inputs
  • 07 Jun 17  –  06 Jul 17
Registration