Project Description

Project title Installation of 12.7MW Solar Power Plant for Power Supply In Ulaanbaatar Suburb
Ref No. MN003
PDD form 
Monitoring plan
MoC(PDF) MoC
Name of project participants (Mongolia) Bridge LLC; Everyday Farm LLC
Name of project participants (Japan) Farmdo Co, Ltd
Name of third party entity (TPE) TPE-MN-004 Japan Management Association
Location of project Country: Mongolia
Region/State/Province etc: Ulaanbaatar, Songinokhairkhan district
City/Town/Community etc: West-61/2km west of the crossing 361
Latitude, longitude:N48°2’06”, E106°30’59”; N48°1’59”, E106°30’43”; N48°1’59”, E106°30’56”, N48°2’07”, E106°30’56”
Duration Starting date of project operation: 26 Aug 17
Expected operational lifetime of project: 20 years
Methodology No.
Emission Reductions (tCO2e) Estimated emission reductions in each year

  • – (in 2013)
  • – (in 2014)
  • – (in 2015)
  • – (in 2016)
  • 1,273 (in 2017)
  • 2,171 (in 2018)
  • 2,171 (in 2019)
  • 2,171 (in 2020)
  • 2,171 (in 2021)
  • 2,171 (in 2022)
  • 2,171 (in 2023)
  • 2,171 (in 2024)
  • 2,171 (in 2025)
  • 2,171 (in 2026)
  • 2,171 (in 2027)
  • 2,171 (in 2028)
  • 2,171 (in 2029)
  • 2,171 (in 2030)
Status Project registered
Public inputs
  • 09 Feb 17  –  10 Mar 17
Registration