{"id":13481,"date":"2015-11-25T11:20:44","date_gmt":"2015-11-25T03:20:44","guid":{"rendered":"http:\/\/www.jcm-mongolia.com\/?post_type=avada_portfolio&#038;p=13481&#038;lang=en"},"modified":"2019-10-14T17:03:46","modified_gmt":"2019-10-14T09:03:46","slug":"replacement-and-installation-of-high-efficiency-heat-only-boiler-hob-for-hot-water-supply-systems","status":"publish","type":"avada_portfolio","link":"https:\/\/www.jcm-mongolia.com\/?avada_portfolio=replacement-and-installation-of-high-efficiency-heat-only-boiler-hob-for-hot-water-supply-systems&lang=en","title":{"rendered":"Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems"},"content":{"rendered":"<table width=\"100%\">\n<tbody>\n<tr>\n<td width=\"28%\"><strong>Methodology No.<\/strong><\/td>\n<td width=\"71%\">MN_AM002<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Proposed Methodology No.<\/strong><\/td>\n<td width=\"71%\">MN_PM002<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Sectoral scope<\/strong><\/td>\n<td width=\"71%\">1. Energy industries<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Title<\/strong><\/td>\n<td width=\"71%\">Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Summaries<\/strong><\/td>\n<td width=\"71%\">GHG emission reduction measures: This project involves the installation of new HOB for hot water supply system and the replacement of existing coal-fired HOB. The boiler efficiency of the reference HOB is typically lower than that of the project HOB. Therefore, the project activity leads to the reduction of coal consumption, resulting in lower emission of GHGs as well as air pollutants. Calculation of reference emissions: Reference emissions are calculated by the net heat quantity supplied by the project HOB, boiler efficiency of the reference HOB and CO2 emission factor of coal.<br \/>\nCalculation of project emissions: The sources of project emissions are coal consumption and electricity consumption of project HOB. Project emissions are calculated by the net heat quantity supplied by the project HOB, boiler efficiency of the project HOB and CO2 emission factor of coal. In addition, project emissions due to auxiliary electricity consumption are included, on the basis of electricity consumption and CO2 emission factor of the grid. Monitoring parameters : Net heat quantity supplied by the project HOB and total hours of the project HOB operation during the monitoring period<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Version Number<\/strong><\/td>\n<td width=\"71%\">Ver1.0<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Status<\/strong><\/td>\n<td width=\"71%\">Valid<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Methodology Proponent<\/strong><\/td>\n<td width=\"71%\">Suuri-Keikaku CO., LTD., Climate Experts LTD.<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Approved Methodology<\/strong><\/td>\n<td width=\"71%\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<span style=\"color: #333399;\">\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/approved_pdf_file\">JCM_MN_AM002_ver01.0.pdf<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/approved_doc_file\">JCM_MN_AM002_ver01.0.docx<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/monitoring_spreadsheet_file\">JCM_MN_AM002_ver01.0.xlsx<\/a><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><span style=\"color: #333333;\"><strong>Proposed Methodology<\/strong><\/span><\/td>\n<td width=\"71%\"><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/methodology_file\">JCM_MN_PM002_ver01.0.pdf<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/excel_file1\">JCM_MN_PM002_ver01.0_PMS.xlsx<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/attached_document1\">JCM_MN_PM002_ver01.0_Add_Info1.pdf<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/attached_document2\">JCM_MN_PM002_ver01.0_Add_Info2.pdf<\/a><\/span><\/p>\n<p><span style=\"color: #333399;\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a style=\"color: #333399;\" href=\"https:\/\/www.jcm.go.jp\/mn-jp\/methodologies\/13\/attached_document3\">JCM_MN_PM002_ver01.0_Add_Info3.pdf<\/a><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Public inputs<\/strong><\/td>\n<td width=\"71%\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 18 Nov 14 \u00a0 &#8211; \u00a002 Dec 14<\/td>\n<\/tr>\n<tr>\n<td width=\"28%\"><strong>Date of approval<\/strong><\/td>\n<td width=\"71%\">28 Jan 15<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n<p><!--more--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Methodology No. MN_AM002 Proposed Methodology No. MN_PM002 Sectoral scope 1. Energy industries Title Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems Summaries GHG emission reduction measures: This project involves the installation of new HOB for hot water supply system and the replacement of existing coal-fired HOB. The boiler [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":[],"_links":{"self":[{"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/avada_portfolio\/13481"}],"collection":[{"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13481"}],"version-history":[{"count":1,"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/avada_portfolio\/13481\/revisions"}],"predecessor-version":[{"id":15542,"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=\/wp\/v2\/avada_portfolio\/13481\/revisions\/15542"}],"wp:attachment":[{"href":"https:\/\/www.jcm-mongolia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}